Difference between revisions of "Transition Mirror Packing Instructions"
Jump to navigation
Jump to search
Line 21: | Line 21: | ||
| 3. Screw in wooden crossbars on top of metal bracket. Cross bars need to cover as many of the aluminum "pucks" as possible. | | 3. Screw in wooden crossbars on top of metal bracket. Cross bars need to cover as many of the aluminum "pucks" as possible. | ||
|The first wooden crossbar lays on top of the parallel metal bar covering 2 "pucks". The second crossbar either covers the last puck or splits the difference if there is more than one puck remaining.|| | |The first wooden crossbar lays on top of the parallel metal bar covering 2 "pucks". The second crossbar either covers the last puck or splits the difference if there is more than one puck remaining.|| | ||
|- | |||
!scope=row | [[File:Tape bag.jpg|200px]] | |||
| 3. Screw down the wall cleat to the bottom corner of the crate. Tape bag of hardware to crate above the cleat.|| | |||
|- | |- | ||
|} | |} |