Stone Rose Install

From Archive | Chen Chen & Kai Williams
Revision as of 20:50, 7 August 2023 by Kai (talk | contribs)
Jump to navigation Jump to search

Stone Rose Install


Sconce 22XX Onwards
Included:
Stone Rose Stem
2 Rose head assemblies
1 Leaf petal
3 Candelabra base 15W T22 E12 bulbs
Felt washers
3 M4 brass acorn nuts
7 Black thumb screws
2 8-32 brass flat head screws with temporary washers

Sconces must be attached to flush wall mounted J-boxes. 120V. Dimmer compatible.


Install
Description Possible Issues
1. TURN OFF POWER TO INSTALL LOCATION
2. Use WAGO connectors to connect sconce wires to wall wires. Polarity does not matter.
3. Use 8-32 brass flat head screws to attach sconce to J-box. Black washers are intended to be removed.
4. Make sure that the cardboard cutout is as near to the end of the pegs as possible to get correct spacing between petals.
5. Keep petals all in one direction. If needed, mark front of petals with tape to clarify.
6. If any petals crack during drilling process, set them aside for gluing/fiberglass.
7. Drill with smallest bit. 4mm. Drill very gently. Place on 380 speed. Too much pressure on the drill press will crack the stone pieces. Quartz is a hard stone, but can be brittle.
8. Only use the drill press to start the hole and use a hand drill to go all the way through. The drill press' pressure can crack the stone and the hand drill allows you to slowly angle the cut for less pressure and will go faster.
9. Wash off all oil in sink, dry with air.